[SUMMARY OF FINAL SUBMITTED VERSION]


REPORT OF LICENSEE FOR REPORTING PERIOD

October 1, 2021 to September 30, 2022

Primary Owner: WEST STANISLAUS IRRIGATION DISTRICT
Primary Contact:

Date Submitted: 01/20/2023

Application Number: A001987
License Number: 003957

Source(s) of Water POD Parcel Number County
TUOLUMNE RIVER Stanislaus
SAN JOAQUIN RIVER Stanislaus

MAX Direct Diversion Rate: 262.15 CFS
MAX Collection to Storage: 0 AC-FT
Face Value: 189790.7 AC-FT

Permitted Use(s) Acres Direct Diversion Season Storage Season
Irrigation 21666 01/01 to 12/31
Compliance with License Terms and Conditions
I have currently reviewed my water right license and I am complying with all terms and conditions Yes
Description of noncompliance with terms and conditions
Changes to the Project
Intake location has been changed
Description of intake location changes
Type of use has changed
Description of type of use changes
Place of use has changed
Description of place of use changes
Other changes
Description of other changes
Purpose of Use
Irrigation
Irrigated Crops
Multiple Crops Area Irrigated (Acres) Primary Irrigation Method
Alfalfa Yes 100 Surface (example: flood)
Almonds and Other Nuts No 12722.50 Sprinkler
Corn Yes 699 Surface (example: flood)
Fruit Yes 337 Surface (example: flood)
Grains (wheat, oat) Yes 307 Surface (example: flood)
Grapes No 674 Sub-surface
Legumes (peas, beans, peanuts) Yes 1586.50 Sub-surface
Tomatoes Yes 1581 Sub-surface
Tree Fruit (other) No 1834.50 Sprinkler
Vegetables Yes 115 Sub-surface
Other: Palms No 7 Sprinkler
Special Use Categories
Are you using any water diverted under this right for the cultivation of cannabis? No
Amount of Water Diverted and Used
Month Amount directly diverted
(Acre-Feet)
Amount diverted or collected to storage
(Acre-Feet)
Amount used
(Acre-Feet)
2021
October
866.8
0
744
November
600.2
0
476
December
882.3
0
202
2022
January
957.7
0
466
February
3273.6
0
2202
March
8375.8
0
7030
April
11050.8
0
9177
May
8239.9
0
6947
June
1690.4
0
1481
July
0
0
0
August
0
0
0
September
0
0
0
Total
35937.5
0
28725
Type of Diversion Direct Diversion Only
Comments
Water Diversion Measurement
Required to measure as of the date this report is submitted Yes
Is diversion measured? Yes
An alternative compliance plan was submitted to the division of water rights on
A request for additional time was submitted to the division of water rights on
Measurement ID numberM030380
This Device/Method was used to measure water during the current reporting periodYes
Briefly describe the measurement device or method4-Path Ultrasonic Technology
NicknameAccusonic Flow Meter
Type of device / methodFlow meter (ultrasonic)
Device makeAccusonic
Serial number1610
Model number8510+10ACR6
Approximate date of installation01/11/2022
Additional info
Approximate date the measuring device was last calibrated or the measurement method was updated01/11/2022
Estimated accuracy of measurement+/- .05%
Description of calibration methodMeasurement of an ultrasonic pulse through the flow path over a specific distance.
Describe the maintenance schedule for the device/methodEvery 3 years.
Information for the person who last calibrated the device or designed the measurement method
NameGreg Pincince
Phone number508-789-6962
Emailgpincince@indexcorp.com
Qualifications of the individualPerson trained and experienced in water measurement (for diversions of less than 100 acre-feet per year - no specific training is required; the person using any equipment and reporting the information must know how to use the equipment and submit correct information)
License number and type for the qualified individual above and/or any other relevant explanation
Type of data recorder device / methodData logger (digital)
Data recorder device makeAccusonic Technology
Data recorder serial number1610
Data recorder model number8510 +
Data recorder units of measurementCubic Feet
Frequency of data recordingMore frequent than hourly
Additional data recorder info
I am required to report my diversion or storage data by telemetry as of the date this report is submitted
I report my diversion or storage date by telemetry to the following website
Measurement Attachments
Measurement ID Number File Name Description Size
No attachments
Measurement Data Files
Measurement ID Number File Name Description Size
No data files
Maximum Rate of Diversion
Month Rate of Diversion (Cubic Feet Per Second)
2021
October 124.1
November 273.6
December 89.2
2022
January 116.7
February 149.1
March 287.2
April 285.2
May 215
June 141.8
July 0
August 0
September 0
Water Transfers
Water transfered No
Quantity transfered (Acre-Feet)
Dates which transfer occurred / to /
Transfer approved by
Water Supply Contracts
Water supply contract Yes
Contract with USBR
Contract number 14-06-200-1072 LTR1-P
Source from which contract water was diverted Delta-Mendota Canal
Point of diversion same as identified water right No
Amount (Acre-Feet) authorized to divert under this contract 50000
Amount (Acre-Feet) authorized to be diverted in 2022 0
Amount (Acre-Feet) projected for 2023 0
Exchange or settlement of prior rights No
All monthly reported diversion claimed under the prior rights No
Amount (Acre-Feet) of reported diversion solely under contract 0
Storage
Reservoir name Spilled this year Feet below spillway at maximum storage Completely emptied Feet below spillway at minimum storage Method used to measure water level
           
Credits Claimed
Conservation Reclaimed Water Use Conjunctive Groundwater Use
Claimed? (Yes/No) Yes
2021
October
November
December
2022
January
February
March
April
May
June
July
August
September
Conservation Supporting Information
Description of conservation methods
Please refer to the attached document titled, "Summary of Water Conservation Efforts by West Stanislaus Irrigation District."
Description of baseline water use and time period
Please refer to the attached document titled, "Summary of Water Conservation Efforts by West Stanislaus Irrigation District."
Description of conservation calculation methods
Please refer to the attached document titled, "2021-2022 Summary of San Joaquin River Diversions Report for West Stanislaus Irrigation District."
Conserved water used? No
Additional Remarks
 
Attachments
File Name Description Size
FY2022 Summary of Water Diversions.pdf 2022 Summary of Water Diversions 162 KB
FY2022 Water Conservation Efforts.pdf 2022 Water Conservation Efforts 125 KB
Contact Information of the Person Submitting the Form
First Name Robert
Last Name Pierce
Relation to Water Right Company Representative
Information on Certification and Signatory
Name of Person Signing and Certifying the Report Robert Pierce
Date of Signature 01/20/2023