[SUMMARY OF FINAL SUBMITTED VERSION]
PROGRESS REPORT BY PERMITTEE FOR REPORTING PERIOD
October 1, 2022 to September 30, 2023
Primary Owner:
MONTEREY COUNTY WATER RESOURCES AGENCY
Primary Contact:
Date Submitted:
01/31/2024
Application Number:
A032263A
Permit Number:
021376
| Source(s) of Water | POD Parcel Number | County |
| BLANCO DRAIN | Monterey |
MAX Direct Diversion Rate:
6
CFS
MAX Collection to Storage:
3000
AC-FT
Face Value:
3000
AC-FT
| Permitted Use(s) | Acres | Direct Diversion Season | Storage Season |
| Municipal | 01/01 to 12/31 | 01/01 to 12/31 | |
| Irrigation | 01/01 to 12/31 | 01/01 to 12/31 |
| Compliance with Permit Terms and Conditions | |
|---|---|
| I have reviewed my water right permit and I am complying with all terms and conditions | Yes |
| Description of noncompliance with terms and conditions | |
| Changes to the Project | |
|---|---|
| Intake location has been changed | |
| Description of intake location changes | |
| Type of use has changed | |
| Description of type of use changes | |
| Place of use has changed | |
| Description of place of use changes | |
| Other changes | |
| Description of other changes | |
| Permitted Project Status | |
|---|---|
| Project Status | Not Complete |
| Construction work has commenced | Yes |
| Construction is completed | Yes |
| Beneficial uses of water has commenced | Yes |
| Project will be completed within the time period specified in the permit | Yes |
| Explanation of work remaining to be done | Diversion and beneficial use of the maximum amount of water needed is dependent on natural conditions. Sufficient water has not been available to fully realize the maximum benefit to date. |
| Estimated date of completion | 12/31/2048 |
| Purpose of Use | |
|---|---|
| Municipal | 110000 |
| Special Use Categories | |
|---|---|
| Are you using any water diverted under this right for the cultivation of cannabis? | No |
| Amount of Water Diverted and Used | |||
|---|---|---|---|
| Month | Amount directly diverted (Acre-Feet) |
Amount diverted or collected to storage (Acre-Feet) |
Amount used (Acre-Feet) |
| 2022 | |||
| October |
0
|
0
|
0
|
| November |
0
|
0
|
0
|
| December |
0
|
0
|
0
|
| 2023 | |||
| January |
0
|
0
|
0
|
| February |
0
|
0
|
0
|
| March |
0
|
0
|
0
|
| April |
0
|
0
|
0
|
| May |
0
|
194.35
|
194.35
|
| June |
0
|
320.64
|
320.64
|
| July |
0
|
209.18
|
209.18
|
| August |
0
|
179.71
|
179.71
|
| September |
0
|
151.48
|
151.48
|
| Total |
0
|
1055.36
|
1055.36
|
| Type of Diversion | Both Direct Diversion and Diversion to Storage | ||
| Comments | |||
| Water Diversion Measurement | |
|---|---|
| Required to measure as of the date this report is submitted | Yes |
| Is diversion measured? | Yes |
| An alternative compliance plan was submitted to the division of water rights on | |
| A request for additional time was submitted to the division of water rights on | |
| Measurement ID number | M024333 |
| This Device/Method was used to measure water during the current reporting period | Yes |
| Briefly describe the measurement device or method | Magnetic Flowmeter |
| Nickname | Blanco Drain Pump Station Flowmeter (FIT-171) |
| Type of device / method | Flow meter (electromagnetic) |
| Device make | Endress+Hauser |
| Serial number | N6038A19000 |
| Model number | 5W4C2F-AAALIP5DUA1K1B+CBZ1 |
| Approximate date of installation | 01/22/2020 |
| Additional info | Factory calibrated in ISO 17025 certified lab |
| Approximate date the measuring device was last calibrated or the measurement method was updated | 07/26/2018 |
| Estimated accuracy of measurement | 0.5% |
| Description of calibration method | Flow - lab two-point calibration performed by manufacturer |
| Describe the maintenance schedule for the device/method | |
| Information for the person who last calibrated the device or designed the measurement method | |
| Name | A. Leroy |
| Phone number | +33 389 75 35 00 |
| Qualifications of the individual | |
| License number and type for the qualified individual above and/or any other relevant explanation | The flowmeter was calibrated at the Endress+Hauser Flowtec AG facility in Cernay, France. The facility is an ISO 17025 certified testing/calibration lab. ISO 17025 is the international standard for testing and calibration facilities. |
| Type of data recorder device / method | Other: SCADA system |
| Data recorder device make | |
| Data recorder serial number | |
| Data recorder model number | |
| Data recorder units of measurement | |
| Frequency of data recording | |
| Additional data recorder info | |
| I am required to report my diversion or storage data by telemetry as of the date this report is submitted | No |
| I report my diversion or storage date by telemetry to the following website | |
| Measurement Attachments | |||
|---|---|---|---|
| Measurement ID Number | File Name | Description | Size |
| M024333 | CO01012DEN_0317_Endress Fact Sheet_Cernay_M024333.pdf | 2 MB | |
| M024333 | FIT 171 - Factory Flowmeter Calibration_M024333.pdf | 379 KB | |
| M024333 | FIT 171 - Flowmeter Instrument Data Sheet_M024333.pdf | 91 KB | |
| Measurement Data Files | |||
|---|---|---|---|
| Measurement ID Number | File Name | Description | Size |
| M024333 | Blanco Drain Diversion and Bypass.xlsx | 2 MB | |
| Maximum Rate of Diversion | |
|---|---|
| Month | Rate of Diversion |
| 2022 | |
| October | |
| November | |
| December | |
| 2023 | |
| January | |
| February | |
| March | |
| April | |
| May | |
| June | |
| July | |
| August | |
| September | |
| Water Transfers | |
|---|---|
| Water transfered | No |
| Quantity transfered (Acre-Feet) | |
| Dates which transfer occurred | / to / |
| Transfer approved by | |
| Water Supply Contracts | |
|---|---|
| Water supply contract | No |
| Contract with | |
| Contract number | |
| Source from which contract water was diverted | |
| Point of diversion same as identified water right | |
| Amount (Acre-Feet) authorized to divert under this contract | |
| Amount (Acre-Feet) authorized to be diverted in 2023 | |
| Amount (Acre-Feet) projected for 2024 | |
| Exchange or settlement of prior rights | |
| All monthly reported diversion claimed under the prior rights | |
| Amount (Acre-Feet) of reported diversion solely under contract | |
| Storage | |||||
|---|---|---|---|---|---|
| Reservoir name | Spilled this year | Feet below spillway at maximum storage | Completely emptied | Feet below spillway at minimum storage | Method used to measure water level |
| Adjudicated Seaside Groundwater Basin | No | 0 | No | 0 | No measurements taken, water stored in the Seaside Groundwater Basin |
| Credits Claimed | |||
|---|---|---|---|
| Conservation | Reclaimed Water Use | Conjunctive Groundwater Use | |
| Claimed? (Yes/No) | No | No | No |
| 2022 | |||
| October | |||
| November | |||
| December | |||
| 2023 | |||
| January | |||
| February | |||
| March | |||
| April | |||
| May | |||
| June | |||
| July | |||
| August | |||
| September | |||
| Conservation Supporting Information | |
|---|---|
| Description of conservation methods
|
|
| Description of baseline water use and time period
|
|
| Description of conservation calculation methods
|
|
| Conserved water used? | |
| Additional Remarks |
|---|
| The raw data sets attached to this report are provided as-is, without any quality assurance and control performed. Therefore, the raw data sets may contain erroneous data for numerous and various reasons. The raw data is evaluated and reviewed for quality assurance and control in order to report monthly diversions under the pertinent water right(s). |
| Attachments | ||
|---|---|---|
| File Name | Description | Size |
| Groundwater Storage Injection and Extraction.xlsx | 83 KB | |
| Contact Information of the Person Submitting the Form | |
|---|---|
| First Name | Peter |
| Last Name | Vannerus |
| Relation to Water Right | Company Representative |
| Information on Certification and Signatory | |
|---|---|
| Name of Person Signing and Certifying the Report | Peter Vannerus |
| Date of Signature | 01/31/2024 |