[SUMMARY OF FINAL SUBMITTED VERSION]
PROGRESS REPORT BY PERMITTEE FOR REPORTING PERIOD
October 1, 2021 to September 30, 2022
Primary Owner:
MONTEREY COUNTY WATER RESOURCES AGENCY
Primary Contact:
Date Submitted:
01/31/2023
Application Number:
A032263A
Permit Number:
021376
| Source(s) of Water | POD Parcel Number | County |
| BLANCO DRAIN | Monterey |
MAX Direct Diversion Rate:
6
CFS
MAX Collection to Storage:
3000
AC-FT
Face Value:
3000
AC-FT
| Permitted Use(s) | Acres | Direct Diversion Season | Storage Season |
| Municipal | 01/01 to 12/31 | 01/01 to 12/31 | |
| Irrigation | 01/01 to 12/31 | 01/01 to 12/31 |
| Compliance with Permit Terms and Conditions | |
|---|---|
| I have reviewed my water right permit and I am complying with all terms and conditions | Yes |
| Description of noncompliance with terms and conditions | |
| Changes to the Project | |
|---|---|
| Intake location has been changed | |
| Description of intake location changes | |
| Type of use has changed | |
| Description of type of use changes | |
| Place of use has changed | |
| Description of place of use changes | |
| Other changes | |
| Description of other changes | |
| Permitted Project Status | |
|---|---|
| Project Status | Not Complete |
| Construction work has commenced | Yes |
| Construction is completed | Yes |
| Beneficial uses of water has commenced | Yes |
| Project will be completed within the time period specified in the permit | Yes |
| Explanation of work remaining to be done | Diversion and beneficial use of the maximum amount of water needed is dependent on natural conditions. Sufficient water has not been available to fully realize the maximum benefit to date. |
| Estimated date of completion | 12/31/2048 |
| Purpose of Use | |
|---|---|
| Municipal | 110000 |
| Special Use Categories | |
|---|---|
| Are you using any water diverted under this right for the cultivation of cannabis? | No |
| Amount of Water Diverted and Used | |||
|---|---|---|---|
| Month | Amount directly diverted (Acre-Feet) |
Amount diverted or collected to storage (Acre-Feet) |
Amount used (Acre-Feet) |
| 2021 | |||
| October |
0
|
27.82
|
27.82
|
| November |
0
|
0.12
|
0.12
|
| December |
0
|
0
|
0
|
| 2022 | |||
| January |
0
|
0
|
0
|
| February |
0
|
0
|
0
|
| March |
0
|
7.02
|
7.02
|
| April |
0
|
11.57
|
11.57
|
| May |
0
|
53.07
|
53.07
|
| June |
0
|
173.29
|
173.29
|
| July |
0
|
2.13
|
2.13
|
| August |
0
|
0
|
0
|
| September |
0
|
0
|
0
|
| Total |
0
|
275.02
|
275.02
|
| Type of Diversion | Both Direct Diversion and Diversion to Storage | ||
| Comments | |||
| Water Diversion Measurement | |
|---|---|
| Required to measure as of the date this report is submitted | Yes |
| Is diversion measured? | Yes |
| An alternative compliance plan was submitted to the division of water rights on | |
| A request for additional time was submitted to the division of water rights on | |
| Measurement ID number | M024333 |
| This Device/Method was used to measure water during the current reporting period | Yes |
| Briefly describe the measurement device or method | Magnetic Flowmeter |
| Nickname | Blanco Drain Pump Station Flowmeter (FIT-171) |
| Type of device / method | Flow meter (electromagnetic) |
| Device make | Endress+Hauser |
| Serial number | N6038A19000 |
| Model number | 5W4C2F-AAALIP5DUA1K1B+CBZ1 |
| Approximate date of installation | 01/22/2020 |
| Additional info | Factory calibrated in ISO 17025 certified lab |
| Approximate date the measuring device was last calibrated or the measurement method was updated | 07/26/2018 |
| Estimated accuracy of measurement | 0.5% |
| Description of calibration method | Flow - lab two-point calibration performed by manufacturer |
| Describe the maintenance schedule for the device/method | |
| Information for the person who last calibrated the device or designed the measurement method | |
| Name | A. Leroy |
| Phone number | +33 389 75 35 00 |
| Qualifications of the individual | |
| License number and type for the qualified individual above and/or any other relevant explanation | The flowmeter was calibrated at the Endress+Hauser Flowtec AG facility in Cernay, France. The facility is an ISO 17025 certified testing/calibration lab. ISO 17025 is the international standard for testing and calibration facilities. |
| Type of data recorder device / method | Other: SCADA system |
| Data recorder device make | |
| Data recorder serial number | |
| Data recorder model number | |
| Data recorder units of measurement | |
| Frequency of data recording | |
| Additional data recorder info | |
| I am required to report my diversion or storage data by telemetry as of the date this report is submitted | No |
| I report my diversion or storage date by telemetry to the following website | |
| Measurement Attachments | |||
|---|---|---|---|
| Measurement ID Number | File Name | Description | Size |
| No attachments | |||
| Measurement Data Files | |||
|---|---|---|---|
| Measurement ID Number | File Name | Description | Size |
| M024333 | BlancoDrainPumpStationHourlyReadings.xlsx | Hourly Blanco Drain Diversion Data | 285 KB |
| Maximum Rate of Diversion | |
|---|---|
| Month | Rate of Diversion (Cubic Feet Per Second) |
| 2021 | |
| October | 1.71 |
| November | 1.66 |
| December | 0 |
| 2022 | |
| January | 0 |
| February | 0 |
| March | 1.69 |
| April | 1.73 |
| May | 4 |
| June | 4 |
| July | 1.77 |
| August | 0 |
| September | 0 |
| Water Transfers | |
|---|---|
| Water transfered | No |
| Quantity transfered (Acre-Feet) | |
| Dates which transfer occurred | / to / |
| Transfer approved by | |
| Water Supply Contracts | |
|---|---|
| Water supply contract | No |
| Contract with | |
| Contract number | |
| Source from which contract water was diverted | |
| Point of diversion same as identified water right | |
| Amount (Acre-Feet) authorized to divert under this contract | |
| Amount (Acre-Feet) authorized to be diverted in 2022 | |
| Amount (Acre-Feet) projected for 2023 | |
| Exchange or settlement of prior rights | |
| All monthly reported diversion claimed under the prior rights | |
| Amount (Acre-Feet) of reported diversion solely under contract | |
| Storage | |||||
|---|---|---|---|---|---|
| Reservoir name | Spilled this year | Feet below spillway at maximum storage | Completely emptied | Feet below spillway at minimum storage | Method used to measure water level |
| Adjudicated Seaside Groundwater Basin | No | 0 | No | 0 | No measurements taken, water stored in the Seaside Groundwater Basin |
| Credits Claimed | |||
|---|---|---|---|
| Conservation | Reclaimed Water Use | Conjunctive Groundwater Use | |
| Claimed? (Yes/No) | No | No | No |
| 2021 | |||
| October | |||
| November | |||
| December | |||
| 2022 | |||
| January | |||
| February | |||
| March | |||
| April | |||
| May | |||
| June | |||
| July | |||
| August | |||
| September | |||
| Conservation Supporting Information | |
|---|---|
| Description of conservation methods
|
|
| Description of baseline water use and time period
|
|
| Description of conservation calculation methods
|
|
| Conserved water used? | |
| Additional Remarks |
|---|
| Attachments | ||
|---|---|---|
| File Name | Description | Size |
| No Attachments | ||
| Contact Information of the Person Submitting the Form | |
|---|---|
| First Name | Jason |
| Last Name | Demers |
| Relation to Water Right | Primary Owner of Record |
| Information on Certification and Signatory | |
|---|---|
| Name of Person Signing and Certifying the Report | Jason Demers |
| Date of Signature | 01/31/2023 |