[SUMMARY OF FINAL SUBMITTED VERSION]


PROGRESS REPORT BY PERMITTEE FOR 2020

Primary Owner: MONTEREY COUNTY WATER RESOURCES AGENCY
Primary Contact:

Date Submitted: 03/30/2021

Application Number: A032263A
Permit Number: 021376

Source(s) of Water POD Parcel Number County
BLANCO DRAIN Monterey

MAX Direct Diversion Rate: 6 CFS
MAX Collection to Storage: 3000 AC-FT
Face Value: 3000 AC-FT

Permitted Use(s) Acres Direct Diversion Season Storage Season
Municipal 01/01 to 12/31 01/01 to 12/31
Irrigation 01/01 to 12/31 01/01 to 12/31
1. Compliance with Permit Terms and Conditions
I have reviewed my water right permit and I am complying with all terms and conditions Yes
Description of noncompliance with terms and conditions
2. Changes to the Project
Intake location has been changed
Description of intake location changes
Type of use has changed
Description of type of use changes
Place of use has changed
Description of place of use changes
Other changes
Description of other changes
3-5. Permitted Project Status
Project Status Not Complete
5a. Construction work has commenced Yes
5b. Construction is completed Yes
5c. Beneficial uses of water has commenced Yes
5d. Project will be completed within the time period specified in the permit Yes
5e. Explanation of work remaining to be done Diversion and beneficial use of the maximum amount of water needed is dependent on natural conditions. Sufficient water has not been available to fully realize the maximum benefit to date.
5f. Estimated date of completion 12/31/2048
6. Purpose of Use
Municipal 110000
Special Use Categories
C1. Are you using any water diverted under this right for the cultivation of cannabis? No
7. Amount of Water Diverted and Used
Month Amount directly diverted
(Acre-Feet)
Amount diverted or
collected to storage
(Acre-Feet)
Amount used
(Acre-Feet)
January 0 0 0
February 0 0 0
March 0 0.15 0
April 0 0.05 0
May 0 141.14 0
June 0 198.21 0
July 0 85.09 0
August 0 0 0
September    0 108.38 69.2
October 0 13.8 234.83
November 0 35.63 234.83
December 0 34.68 78.27
Total 0 617.13 617.13
Type of Diversion Diversion to Storage Only
Comments
8. Water Diversion Measurement
a. Required to measure as of the date this report is submitted Yes
b. Is diversion measured? Yes
c. An alternative compliance plan was submitted to the division of water rights on
d. A request for additional time was submitted to the division of water rights on
Measurement ID numberM024333
This Device/Method was used to measure water during the current reporting periodYes
M1. Briefly describe the measurement device or methodMagnetic Flowmeter
M2. NicknameBlanco Drain Pump Station Flowmeter (FIT-171)
M3. Type of device / methodFlow meter (electromagnetic)
M4. Device makeEndress+Hauser
M5. Serial numberN6038A19000
M6. Model number5W4C2F-AAALIP5DUA1K1B+CBZ1
M7. Approximate date of installation01/22/2020
M8. Additional infoFactory calibrated in ISO 17025 certified lab
M9. Approximate date the measuring device was last calibrated or the measurement method was updated07/26/2018
M10. Estimated accuracy of measurement0.5%
M11. Description of calibration methodFlow - lab two-point calibration performed by manufacturer
M12. Describe the maintenance schedule for the device/method
Information for the person who last calibrated the device or designed the measurement method
M13. NameA. Leroy
M14. Phone number+33 389 75 35 00
M15. Email
M16. Qualifications of the individual
M17. License number and type for the qualified individual above and/or any other relevant explanationThe flowmeter was calibrated at the Endress+Hauser Flowtec AG facility in Cernay, France. The facility is an ISO 17025 certified testing/calibration lab. ISO 17025 is the international standard for testing and calibration facilities.
M18. Type of data recorder device / methodOther: SCADA system
M19. Data recorder device make
M20. Data recorder serial number
M21. Data recorder model number
M22. Data recorder units of measurement
M23. Frequency of data recording
M24. Additional data recorder info
M25. I am required to report my diversion or storage data by telemetry as of the date this report is submittedNo
M26. I report my diversion or storage date by telemetry to the following website
Measurement Attachments
Measurement ID Number File Name Description Size
M024333 CO01012DEN_0317_Endress Fact Sheet_Cernay.pdf Endress+Hauser Flowtec AG Fact Sheet 2 MB
M024333 FIT 171 - Factory Flowmeter Calibration.pdf Factory flowmeter calibration 379 KB
M024333 FIT 171 - Flowmeter Instrument Data Sheet.pdf Flowmeter data sheet 91 KB
Measurement Data Files
Measurement ID Number File Name Description Size
No data files
9. Maximum Rate of Diversion
Month Rate of Diversion (Cubic Feet Per Second)
January 0
February 0
March 5.78
April 0.71
May 6.89
June 6.49
July 6.81
August 0
September 6.95
October 6.76
November 6.64
December 2.86
10.Water Transfers
10a. Water transfered No
10b. Quantity transfered (Acre-Feet)
10c. Dates which transfer occurred / to /
10d. Transfer approved by
Water Supply Contracts
10e. Water supply contract No
10f. Contract with
10g. Other provider
10h. Contract number
10i. Source from which contract water was diverted
10j. Point of diversion same as identified water right
10k. Amount (Acre-Feet) authorized to divert under this contract
10l. Amount (Acre-Feet) authorized to be diverted in 2020
10m. Amount (Acre-Feet) projected for 2021
10n. Exchange or settlement of prior rights
10o. All monthly reported diversion claimed under the prior rights
10p. Amount (Acre-Feet) of reported diversion solely under contract
11. Storage
Reservoir name Spilled this year Feet below spillway at maximum storage Completely emptied Feet below spillway at minimum storage Method used to measure water level
Adjudicated Seaside Groundwater Basin  No 0 No 0 Water stored in the Seaside Groundwater Basin
Credits Claimed
Conservation Reclaimed Water Use Conjunctive Groundwater Use
Claimed? (Yes/No) No No No
January
February
March
April
May
June
July
August
September
October
November
December
Conservation Supporting Information
Description of conservation methods
Description of baseline water use and time period
Description of conservation calculation methods
Conserved water used?
Additional Remarks
 
Attachments
File Name Description Size
Blanco PS Tech Memo 3-11-21.pdf Technical Memorandum related to short term exceedances of maximum diversion rate. 103 KB
Contact Information of the Person Submitting the Form
First Name Jason
Last Name Demers
Relation to Water Right Primary Owner of Record
Information on Certification and Signatory
Name of Person Signing and Certifying the Report Jason Demers
Date of Signature 03/30/2021