[SUMMARY OF FINAL SUBMITTED VERSION]


PROGRESS REPORT BY PERMITTEE FOR 2019

Primary Owner: MONTEREY COUNTY WATER RESOURCES AGENCY
Primary Contact:

Date Submitted: 04/01/2020

Application Number: A032263B
Permit Number: 021377

Source(s) of Water POD Parcel Number County
RECLAMATION DITCH Monterey

MAX Direct Diversion Rate: 6 CFS
MAX Collection to Storage: 2000 AC-FT
Face Value: 2000 AC-FT

Permitted Use(s) Acres Direct Diversion Season Storage Season
Municipal 01/01 to 12/31 01/01 to 12/31
Irrigation 01/01 to 12/31 01/01 to 12/31
1. Compliance with Permit Terms and Conditions
I have reviewed my water right permit and I am complying with all terms and conditions Yes
Description of noncompliance with terms and conditions
2. Changes to the Project
Intake location has been changed
Description of intake location changes
Type of use has changed
Description of type of use changes
Place of use has changed
Description of place of use changes
Other changes
Description of other changes
3-5. Permitted Project Status
Project Status Complete
5a. Construction work has commenced
5b. Construction is completed
5c. Beneficial uses of water has commenced
5d. Project will be completed within the time period specified in the permit
5e. Explanation of work remaining to be done
5f. Estimated date of completion
6. Purpose of Use
Irrigation
Irrigated Crops
Multiple Crops Area Irrigated (Acres) Primary Irrigation Method
Other: various Yes 12049 Sprinkler
Special Use Categories
C1. Are you using any water diverted under this right for the cultivation of cannabis? No
7. Amount of Water Diverted and Used
Month Amount directly diverted
(Acre-Feet)
Amount diverted or
collected to storage
(Acre-Feet)
Amount used
(Acre-Feet)
January 0 0 0
February 0 0 0
March 0 0 0
April 0 0 0
May 0 0 0
June 0 0 0
July 0 0 0
August 0.1 0 0.1
September    0 0 0
October 0 0 0
November 0 0 0
December 0 0 0
Total 0.1 0 0.1
Type of Diversion Direct Diversion Only
Comments Water was diverted for system testing on August 14, 2019.
8. Water Diversion Measurement
a. Required to measure as of the date this report is submitted Yes
b. Is diversion measured? Yes
c. An alternative compliance plan was submitted to the division of water rights on
d. A request for additional time was submitted to the division of water rights on
Measurement ID numberM018775
This Device/Method was used to measure water during the current reporting periodYes
M1. Briefly describe the measurement device or methodMagnetic Flowmeter
M2. NicknameReclamation Ditch Diversion Flow Meter
M3. Type of device / methodFlow meter (electromagnetic)
M4. Device makeEndress+Hauser
M5. Serial numberN7236119000
M6. Model number5W4C3H-AAALIP5DUA1K1B+CBZ1
M7. Approximate date of installation05/10/2019
M8. Additional info
M9. Approximate date the measuring device was last calibrated or the measurement method was updated12/09/2018
M10. Estimated accuracy of measurement0.5%
M11. Description of calibration methodThe flow meter was factory calibrated on 12/09/2018 at the Endress+Hauser Flowtec AG facility in Cernay, France. The meter was installed and field checked by Tesco Controls, Inc. on 05/10/2019.
M12. Describe the maintenance schedule for the device/methodThe flow meter will be field calibrated not less than once every five years using one of the two methods described in the 2017 Compliance Plan for the Reclamation Ditch Diversion Water Right Permit 21377 of the Monterey County Water Resources Agency.
Information for the person who last calibrated the device or designed the measurement method
M13. NameR. Barina
M14. Phone number+33 389 75 35 00
M15. Email
M16. Qualifications of the individualPerson trained and experienced in water measurement (for diversions of less than 100 acre-feet per year - no specific training is required; the person using any equipment and reporting the information must know how to use the equipment and submit correct information)
M17. License number and type for the qualified individual above and/or any other relevant explanationThe flow meter was factory calibrated at the Endress+Hauser Flowtec AG facility (Cernay, France). This facility is an ISO 17025 certified testing/calibration laboratory (ISO 17025 is the international standard for testing and calibration laboratories).
M18. Type of data recorder device / methodLedger
M19. Data recorder device make
M20. Data recorder serial number
M21. Data recorder model number
M22. Data recorder units of measurement
M23. Frequency of data recording
M24. Additional data recorder infoTesting was performed for approximately 1 hour on 08/14/2019. Visual flow meter readings were logged in the attached hourly flow log. A digital data recorder will be online when the project is operated in 2020.
M25. I am required to report my diversion or storage data by telemetry as of the date this report is submittedNo
M26. I report my diversion or storage date by telemetry to the following website
Measurement Attachments
Measurement ID Number File Name Description Size
No attachments
Measurement Data Files
Measurement ID Number File Name Description Size
M018775 Reclamation Ditch Diversion Report - 2019.xlsx Monthly, Daily, and Hourly Reclamation Diversion Report 148 KB
9. Maximum Rate of Diversion
Month Rate of Diversion (Cubic Feet Per Second)
January 0
February 0
March 0
April 0
May 0
June 0
July 0
August 1.15
September 0
October 0
November 0
December 0
10.Water Transfers
10a. Water transfered No
10b. Quantity transfered (Acre-Feet)
10c. Dates which transfer occurred / to /
10d. Transfer approved by
Water Supply Contracts
10e. Water supply contract No
10f. Contract with
10g. Other provider
10h. Contract number
10i. Source from which contract water was diverted
10j. Point of diversion same as identified water right
10k. Amount (Acre-Feet) authorized to divert under this contract
10l. Amount (Acre-Feet) authorized to be diverted in 2019
10m. Amount (Acre-Feet) projected for 2020
10n. Exchange or settlement of prior rights
10o. All monthly reported diversion claimed under the prior rights
10p. Amount (Acre-Feet) of reported diversion solely under contract
11. Storage
Reservoir name Spilled this year Feet below spillway at maximum storage Completely emptied Feet below spillway at minimum storage Method used to measure water level
Seaside Groundwater Basin  No 0 No 0 no water stored in 2019
Conservation of Water
12. Are you now employing water conservation efforts? No
Description of water conservation efforts
13. Amount of water conserved
Water Quality and Wastewater Reclamation
14. During the period covered by this Report, did you use reclaimed water from a wastewater treatment facility, water from a desalination facility, or water polluted by waste to a degree which unreasonably affects the water for other beneficial uses? No
15. Amount of reclaimed, desalinated, or polluted water used
Conjuctive Use of Groundwater and Surface Water
16. During the period covered by this Report, were you using groundwater in lieu of available surface water authorized under your permit? No
17. Amounts of groundwater used
Additional Remarks
 
Attachments
File Name Description Size
FIT-271 Signed Installation and Start-up Forms - Rec Ditch Flowmeter.pdf Flow meter installation sheet 263 KB
FIT 271 - Factory Flowmeter Calibration - Rec Ditch.pdf Flow meter calibration sheet 291 KB
Final RecDitchCompliance_13Jan2017.pdf Compliance plan 6 MB
Contact Information of the Person Submitting the Form
First Name Jason
Last Name Demers
Relation to Water Right Company Representative
Information on Certification and Signatory
Name of Person Signing and Certifying the Report Jason Demers
Date of Signature 04/01/2020