PROGRESS REPORT BY PERMITTEE FOR 2017
Primary Owner:
MONTEREY COUNTY WATER RESOURCES AGENCY
Primary Contact:
Robert
Johnson
Date Submitted:
03/30/2018
Application Number:
A026901
Permit Number:
019940
MAX Direct Diversion Rate:
500
CFS
MAX Collection to Storage:
0
AC-FT
Face Value:
361988.8
AC-FT
| 1. Permit Review |
| I have reviewed my water right permit |
Yes
|
| 2. Compliance with Permit Terms and Conditions |
| I am complying with all terms and conditions |
Yes
|
| Description of noncompliance with terms and conditions |
|
| 3. Changes to the Project |
| Intake location has been changed |
|
| Description of intake location changes |
|
| Type of use has changed |
|
| Description of type of use changes |
|
| Place of use has changed |
|
| Description of place of use changes |
|
| Other changes |
|
| Description of other changes |
|
| 4-6. Permitted Project Status |
| Project Status |
Complete
|
| 6a. Construction work has commenced |
|
| 6b. Construction is completed |
|
| 6c. Beneficial uses of water has commenced |
|
| 6d. Project will be completed within the time period specified in the permit |
|
| 6e. Explanation of work remaining to be done |
|
| 6f. Estimated date of completion |
|
|
7. Purpose of Use
|
| Power |
13305
MW
|
| Special Use Categories |
| C1. Are you using any water diverted under this right for the cultivation of cannabis? |
No |
| 8. Maximum Rate of Diversion for each Month |
| Month |
Maximum Rate of Diversion
(CFS)
|
| January |
451 |
| February |
451 |
| March |
25 |
| April |
350 |
| May |
441 |
| June |
470 |
| July |
460 |
| August |
468 |
| September |
390 |
| October |
420 |
| November |
25 |
| December |
25 |
| 9. Amount of Water Diverted and Used |
| Month |
Amount directly diverted
(Acre-Feet)
|
Amount diverted or
collected to storage
(Acre-Feet)
|
Amount used
(Acre-Feet)
|
| January |
0 |
0 |
7829 |
| February |
0 |
0 |
14097 |
| March |
0 |
0 |
50 |
| April |
0 |
0 |
13793 |
| May |
0 |
0 |
21331 |
| June |
0 |
0 |
27329 |
| July |
0 |
0 |
24958 |
| August |
0 |
0 |
25855 |
| September |
0 |
0 |
22929 |
| October |
0 |
0 |
10318 |
| November |
0 |
0 |
1488 |
| December |
0 |
0 |
1537 |
| Total |
0 |
0 |
171514 |
| Type of Diversion |
Diversion to Storage Only |
| Comments |
Water collected to storage is being reported under Permits 10137 and 21089. |
|
Water Transfers
|
|
9d. Water transfered
|
No
|
|
9e. Quantity transfered (Acre-Feet)
|
|
|
9f. Dates which transfer occurred
|
/
to
/
|
|
9g. Transfer approved by
|
|
|
Water Supply Contracts
|
|
9h. Water supply contract
|
No
|
|
9i. Contract with
|
|
|
9j. Other provider
|
|
|
9k. Contract number
|
|
|
9l. Source from which contract water was diverted
|
|
|
9m. Point of diversion same as identified water right
|
|
|
9n. Amount (Acre-Feet) authorized to divert under this contract
|
|
|
9o. Amount (Acre-Feet) authorized to be diverted in
2017
|
|
|
9p. Amount (Acre-Feet) projected for
2018
|
|
|
9q. Exchange or settlement of prior rights
|
|
|
9r. All monthly reported diversion claimed under the prior rights
|
|
|
9s. Amount (Acre-Feet) of reported diversion solely under contract
|
|
|
10. Water Diversion Measurement
|
| a. Required to measure as of the date this report is submitted |
Yes |
| b. Is diversion measured? |
Yes |
| c. An alternative compliance plan was submitted to the division of water rights on |
|
| d. A request for additional time was submitted to the division of water rights on |
|
| Measurement ID number | M001941 |
| This Device/Method was used to measure water during the current reporting period | |
| M1. Briefly describe the measurement device or method | Accusonic Flowmeter |
| M2. Nickname | Nacimiento Hydroelectric Flowmeter |
| M3. Type of device / method | Doppler or other electronic device |
| M4. Device make | Accusonic |
| M5. Serial number | 975 |
| M6. Model number | 7510-C |
| M7. Approximate date of installation | 09/13/2005 |
| M8. Additional info | |
| M9. Approximate date the measuring device was last calibrated or the measurement method was updated | 09/13/2005 |
| M10. Estimated accuracy of measurement | 0.50% |
| M11. Description of calibration method | "Dry calibrated" based on precise as-built measurements taken at the time of transducer installation. In addition, Accusonic multi-path flowmeters do not require initial flow profiling calibration exercises nor subsequent re-calibration over time. |
| M12. Describe the maintenance schedule for the device/method | |
| Information for the person who last calibrated the device or designed the measurement method |
| M13. Name | Accusonic Technologies |
| M14. Phone number | 256-430-3366 |
| M15. Email | |
| M16. Qualifications of the individual | Other |
| M17. License number and type for the qualified individual above and/or any other relevant explanation | Installed and Calibrated by Accusonic Technologies |
| M18. Type of data recorder device / method | Ledger |
| M19. Data recorder device make | |
| M20. Data recorder serial number | |
| M21. Data recorder model number | |
| M22. Data recorder units of measurement | Cubic Feet |
| M23. Frequency of data recording | Daily |
| M24. Additional data recorder info | |
| M25. I am required to report my diversion or storage data by telemetry as of the date this report is submitted | No |
| M26. I report my diversion or storage date by telemetry to the following website | |
| M27. I have attached additional information on the method I used to calculate the volume of water | |
| M28. Describe any documents related to this measurement device or method that are attached to this water use report | |
| 11. Storage |
| Reservoir name |
Spilled this year |
Feet below spillway at maximum storage |
Completely emptied |
Feet below spillway at minimum storage |
Method used to measure water level |
| |
|
|
|
|
|
| Conservation of Water |
| 12. Are you now employing water conservation efforts? |
No
|
| Description of water conservation efforts |
|
| 13. Amount of water conserved |
|
| Water Quality and Wastewater Reclamation |
|
14. During the period covered by this Report, did you use reclaimed water
from a wastewater treatment facility, water from a desalination facility,
or water polluted by waste to a degree which unreasonably affects the
water for other beneficial uses?
|
Yes
|
| 15. Amount of reclaimed, desalinated, or polluted water used |
18279
Acre-Feet
|
| Conjuctive Use of Groundwater and Surface Water |
|
16. During the period covered by this Report, were you using groundwater
in lieu of available surface water authorized under your permit?
|
No
|
| 17. Amounts of groundwater used |
|
| Attachments |
| File Name |
Description |
Size |
| No Attachments |
| Contact Information of the Person Submitting the Form |
| First Name |
Germán |
| Last Name |
Criollo |
| Relation to Water Right |
Other: MCWRA Staff |
|
Information on Certification and Signatory
|
|
Name of Person Signing and Certifying the Report
|
German Criollo
|
|
Date of Signature
|
03/30/2018
|